Parking Lot Paving Project

East Parking Lot Timeline -Weather Permiting

Phase One

  • Surveying and Staking
  • Demolition and Excavating
  • Lime Stabilization
  • Light Pole Relocation
  • Forming & Finishing

Phase Two

  • Demolition and Excavating
  • Soil Stabilization
  • Concrete Placement
  • E Parking Lot Joint Sealant
  • Curbs
  • E Parking Lot Landscaping
  • E Parking Lot Sidewalks
  1. 1 Preconstruction Photo of the East Parking Lot
  2. 2 Demo and Excavation
  3. 3 Soil Stabilization and Lime
  4. 4 Soil Stabilization and Lime
  5. 5 Demo and Excavation
  6. 6 Demo and Excavation
  7. 7 Demo and Excavation
  8. 8 Demo and Excavation
  9. 9 Demo and Excavation
  10. 10 Demo and Excavation
  11. 11 IMG_0118-2
  12. 12 Soil Stabilization and Lime
  13. 13 Soil Stabilization and Lime
  14. 14 Soil Stabilization and Lime
  15. 15 Forming of the rebar prior to pouring concrete.
  16. 16 Forming of the rebar prior to pouring concrete.
  17. 17 Forming of the rebar prior to pouring concrete.
  18. 18 Forming of the rebar prior to pouring concrete.
  19. 19 Pouring concrete
  20. 20 Pouring concrete
  21. 21 Pouring Concrete
  22. 22 Pouring Concrete
  23. 23 Phase Two Demo and Excavation
  24. 24 Phase Two Demo and Excavation
  25. 25 Phase Two Demo and Excavation
  26. 26 Phase Two Demo and Excavation
  27. 27 Phase Two Soil Stabilization
  28. 28 Phase Two Soil Stabilization
  29. 29 Phase Two Soil Stabilization
  30. 30 Phase Two Soil Stabilization
  31. 31 Concrete Placement Phase 2
  32. 32 Concrete Placement Phase 2
  33. 33 Concrete Placement Phase 2
  34. 34 Concrete Placement Phase 2
  35. 35 East Parking Lot Joint Sealant
  36. 36 East Parking Lot Joint Sealant
  37. 37 Curbs
  38. 38 Curbs
  39. 39 Curbs
  40. 40 E Parking Lot Sidewalks
  41. 41 E Parking Lot Sidewalks
  42. 42 E Parking Lot Sidewalks
  43. 43 E Parking Lot Landscaping
  44. 44 E Parking Lot Landscaping
  45. 45 E Parking Lot Landscaping
  46. 46 E Parking Lot Landscaping