Parking Lot Paving Project
East Parking Lot Timeline -Weather Permiting
Phase One
- Surveying and Staking
- Demolition and Excavating
- Lime Stabilization
- Light Pole Relocation
- Forming & Finishing
Phase Two
- Demolition and Excavating
- Soil Stabilization
- Concrete Placement
- E Parking Lot Joint Sealant
- Curbs
- E Parking Lot Landscaping
- E Parking Lot Sidewalks
- 1 Preconstruction Photo of the East Parking Lot
- 2 Demo and Excavation
- 3 Soil Stabilization and Lime
- 4 Soil Stabilization and Lime
- 5 Demo and Excavation
- 6 Demo and Excavation
- 7 Demo and Excavation
- 8 Demo and Excavation
- 9 Demo and Excavation
- 10 Demo and Excavation
- 11 IMG_0118-2
- 12 Soil Stabilization and Lime
- 13 Soil Stabilization and Lime
- 14 Soil Stabilization and Lime
- 15 Forming of the rebar prior to pouring concrete.
- 16 Forming of the rebar prior to pouring concrete.
- 17 Forming of the rebar prior to pouring concrete.
- 18 Forming of the rebar prior to pouring concrete.
- 19 Pouring concrete
- 20 Pouring concrete
- 21 Pouring Concrete
- 22 Pouring Concrete
- 23 Phase Two Demo and Excavation
- 24 Phase Two Demo and Excavation
- 25 Phase Two Demo and Excavation
- 26 Phase Two Demo and Excavation
- 27 Phase Two Soil Stabilization
- 28 Phase Two Soil Stabilization
- 29 Phase Two Soil Stabilization
- 30 Phase Two Soil Stabilization
- 31 Concrete Placement Phase 2
- 32 Concrete Placement Phase 2
- 33 Concrete Placement Phase 2
- 34 Concrete Placement Phase 2
- 35 East Parking Lot Joint Sealant
- 36 East Parking Lot Joint Sealant
- 37 Curbs
- 38 Curbs
- 39 Curbs
- 40 E Parking Lot Sidewalks
- 41 E Parking Lot Sidewalks
- 42 E Parking Lot Sidewalks
- 43 E Parking Lot Landscaping
- 44 E Parking Lot Landscaping
- 45 E Parking Lot Landscaping
- 46 E Parking Lot Landscaping